• For more information call (301) 606-5815

  • Main Cave Project

    This is on the second floor of a garage. We started with framing of the fireplace and knee walls. Then the whole room was spray foamed. Drywall was hung and finished. Bead board was installed on the ceiling. A custom bookcase was built in. Various other trim was installed to homeowners specifications. It is now ready for paint and stain. I will get pictures of room when finished and post.